Wuxi Sunsky Machinery Co.,Ltd
                                  Email:[email protected]
tupian

Full Automatic Cotton Hydro Extractor

JF-90 Specially designed hydro extractor for packages meets the always major needs in yarn package dye houses.The driving motor is controlled by inverter with its separative factors adjustable and braking adaptable according to the load.All mechanical braking system are eliminated and therefore excluding eventual maintenance works.

The machine is characterized by the double and automatic interchangeable material carriers for packages which is controlled by advanced PLC controller and imposes a constant and regular production rate according to the type of yarn. While one material carrier for packages is inside the hydro extractor, a second material carrier permits an operator to carry out, in an easy way, all the unloading and loading of packages, thus preparing the machine for a successive production cycle.

The machine lifting and whirligig system adopts the hydraulic control for automatic orientation with precise safety.

The rotating basket is equipped with housings for the accommodation of packages during hydro extraction while the spindles of the package carrier are adopted according the needs of the client. And the speed of hydro extractor can be adjusted. Thus assure a mild treatment to the yarn and avoids the deformation of packages further to breakage of the internal tubes.

The inner basket and the body of the machine are constructed in high quality stainless steel for long serve time.

Production Data:
Yarn typeExtraction timeResidual moisture
Synthetics3min8-12%
Wool blends4min15-25%
Wool /cotton blends4min25-30%
Cotton5min45-50%
Silk5min35-40%
viscose5min60-70%

If you are satisfied with our full automatic labor saving cotton polyester yarn hydro extractor, please be free to contact our professional manufacturers and suppliers in China. The customized machines made in China are also offered with competitive price in our factory.

Q1:What about the after-sale services?

Without man-made faults,the warranty is 18months after commissioning,spare parts can be replaced

within 3months since the delivery of dyeing machine.Engineers available to service machinery overseas,

commissioning and technical support,etc.

Q2:What is your quality?

we have QC on each process in production.We will give the right schedule and quality machine.

Q3: How long is your delivery time?

A: Generally, it is about 50 days after payment.

top